SYS / PROD-CALC v2.1
Production
Time Calculator
Plot your shift end-time across coaching, meetings, breaks, and the rest. Real math, zero spreadsheets.
LIVE PROJECTION
--:-- --
Today's total
hm
Editable · default 7h 30m
Skip breakdown
Billable0h 00m
Non-billable0h 00m
Billable is inside today's total · non-billable extends end time
Production start
When the shift begins
Production Skip Time
Log multiple intervals per category
Σ 0h 00m
Coachingbillable
—start
end
Meetingbillable
—start
end
Well-beingbillable
—start
end
FBbillable
—start
end
Lunchnon-billable
—start
end
Breaknon-billable
—start
end
Unavailablenon-billable
—start
end
Total billable
7h 30m
Non-billable skip
0h 00m
Extends end time
Production ending at
—:—
Set a start time to project the end